久久一区二区三区精品,国产影院一区二区,免费毛片**,国产精品mm,欧美激情精品久久久久久不卡,久久黄色精品视频,午夜色影院,久久第一区

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 19156

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 湛江市| 乌兰浩特市| 临西县| 磐石市| 和顺县| 安图县| 凤凰县| 锡林郭勒盟| 湘潭县| 云林县| 新邵县| 思南县| 浦东新区| 阳朔县| 宣武区| 肥西县| 永寿县| 巩义市| 鄂托克前旗| 海南省| 象山县| 庆安县| 林州市| 安达市| 北辰区| 称多县| 改则县| 察哈| 中牟县| 阿瓦提县| 祁阳县| 称多县| 温宿县| 新龙县| 当阳市| 宜兴市| 麟游县| 曲靖市| 温州市| 兴义市| 东宁县|